Cumulative Gas Production vs Time
East Texas Basin — CV Lower Taylor — Frac Model Predicted Production
Production
Revenue ($)
1 Year
5 Years
10 Years
CV Analog 1H PM (Baseline)
Design 1 (SW/LIN/XL + Oxidizer)
Design 2 (SW/LIN/XL + MHT)
Design 3 (LIN/XL + MHT)
Design 4 (SW/LIN/XL + Oxidizer)
Design 5 (SW/LIN/XL + MHT)
0.0
0.3
0.6
0.9
1.3
1.6
1.9
2.2
2.5
0
2
4
6
8
10
12
Producing Time (months)
Cumulative Gas Production (Bscf)